NK Asphalt After

The old surface at The West Australian Newspaper had failed due to age and heavy vehicle use as part of their daily operations.  They needed us to carry out car park resurfacing for them. We removed the old surface, repaired the base and laid a new asphalt surface, all in one day on site for each of the two visits.

During the process, it was important that their business operations were not disturbed. We catered for this by splitting the job into two distinct sections so that there would always be access available for vehicles and pedestrians.

We were able to complete this whole job within two days on site with minimal disturbance.

NK Asphalt Before
Client: WA Newspapers
Type of work: Profiling and removal of old asphalt surface in two staged visits to cater for operational restrictions.
Transport of waste offsite
Minor repairs to underlaying base
Laying new asphalt surface in two sections to allow operational use by client to adjacent areas
Leave site in neat and tidy condition

Services Repairs and resurfacing